Licensed & insured general contractor · Milwaukee & Waukesha countiesMon–Fri 7am–6pm · Sat 9am–4pm(414) 698-3160
Bathroom remodeling

Bathroom remodeling in Milwaukee.

We turn outdated, cramped bathrooms into bright, easy-to-clean spaces, and we manage every detail from tear-out and plumbing to the last bead of grout.

  • Fully waterproofed
  • Licensed plumbing
  • Clean, respectful crew
New porcelain tub surround with mosaic band and built-in niche
What's included

From a tub swap to a full gut.

Every bathroom we build gets proper waterproofing behind the tile, so it looks good on day one and stays that way for years.

01

Complete bathroom remodels

Layout, plumbing, electrical, tile and fixtures, all coordinated by one team.

02

Showers & bathtubs

Walk-in showers, glass enclosures, soaking tubs and tub-to-shower conversions.

03

Vanities & cabinets

Single and double vanities, medicine cabinets, linen storage and mirrors.

04

Tile work & flooring

Porcelain, ceramic and mosaic walls and floors, plus waterproof LVP and LVT.

05

Waterproofing

Membrane systems, cement board and sloped pans that keep water where it belongs.

06

Accessibility upgrades

Grab bars, low-curb showers, comfort-height toilets and slip-resistant floors.

Bathroom before remodel Bathroom after remodel with tiled tub surround BeforeAfter
Built to last

What's behind the tile matters most.

Plenty of older Milwaukee homes still have plaster-and-lath shower walls with water damage hiding behind them. We open it up, fix what's rotten, rough in new valves and build a fully waterproof assembly before a single tile goes on.

The result is a bathroom that's beautiful on day one and still sealed tight ten winters from now. As one client put it, "our bathroom feels like a hotel now."

See bathroom projects
Our process

Four steps. No surprises.

Free on-site assessment

We look behind the surface and talk through options.

Permits & planning

Layout, fixtures and tile chosen, permits filed.

Expert construction

Demo, plumbing, waterproofing, tile and trim.

Final walkthrough

Every fixture tested and every line checked with you.

Reviews

Bathroom clients, in their words.

All reviews
★★★★★
"I was nervous about hiring a contractor, but I'm so glad we chose Advansé. Our bathroom feels like a hotel now."
DM
Danielle MiliaBathroom remodel
★★★★★
"We love our new bathroom. The crew was on time every single day and paid attention to every detail."
AS
Ashwin SantiagoBathroom remodel
★★★★★
"On time, honest and thorough. My partner was blown away by the new bathroom."
MM
Melaina MercereauBathroom remodel
How long does a bathroom remodel take?

A tub surround or shower update can take about a week. A complete remodel with new plumbing and tile typically takes two to four weeks. Your written schedule will spell it out.

Can you convert my tub into a walk-in shower?

Yes. Tub-to-shower conversions are one of our most requested projects. We handle the drain relocation, waterproof pan, tile and glass.

Will I lose my only bathroom for weeks?

We plan around it. Where possible we keep the toilet working until late in the job and schedule the most disruptive work in tight blocks.

What if you find water damage?

We'll show you exactly what we found, explain the fix and price it before we do anything. No surprise invoices.

Ready for a bathroom you love?

Book a free on-site estimate. We'll look behind the walls, talk through options and price it in writing.

Call nowFree estimate