Licensed & insured general contractor · Milwaukee & Waukesha countiesMon–Fri 7am–6pm · Sat 9am–4pm(414) 698-3160
Deck remodeling

Decks built for Wisconsin summers, and winters.

New decks, full rebuilds and resurfacing in pressure-treated wood, cedar or low-maintenance composite. Every deck goes on frost-depth footings with code-compliant railings and stairs.

  • Frost-depth footings
  • Permits handled
  • Wood or composite
Our framing crew's work: a new structure with new wood fence in a Milwaukee backyard
What's included

From footings to the last baluster.

A deck is only as good as what holds it up. We size the beams, set the footings below the frost line and flash the ledger so water never gets into your house.

01

New deck construction

Ground-level, raised and multi-level decks designed around your yard.

02

Deck rebuilds

Rotted framing replaced and the deck rebuilt to current code.

03

Resurfacing

New boards over sound framing, a faster, lower-cost refresh.

04

Composite & PVC

No staining, no splinters, no annual maintenance.

05

Railings & stairs

Wood, composite, aluminum or cable rail with safe, even stairs.

06

Permits & inspections

Drawings, permits and footing inspections handled for you.

Choosing materials

Wood or composite?

Both make a great deck. The right one depends on budget and how much upkeep you want.

MaterialUpkeepLookLifespanBudget
Pressure-treated pineStain every 2–3 yrsClassic wood, takes any stain color15–20 years$
CedarSeal every 2–3 yrsRich natural color, weathers to silver15–20 years$$
Composite / PVCWash onlyWood-grain boards, won't splinter or fade much25+ years$$–$$$
Our process

Four steps. No surprises.

Free on-site assessment

We measure, check the existing deck and talk options.

Permits & planning

Deck drawing, material selection and permit filed.

Expert construction

Footings, framing, decking, railings and stairs.

Final walkthrough

Inspection passed and every board checked with you.

Can my old deck be resurfaced instead of replaced?

If the framing, footings and ledger are sound, yes, and it saves a lot. We'll probe the framing during the estimate and give you an honest answer.

When is the best time to build a deck?

Spring through fall is ideal. Booking in late winter gets you on the schedule for early-season builds.

Do I need a permit?

In most of our service area, yes, especially for raised decks or any deck attached to the house. We handle it.

Let's get you outside.

Free on-site estimate with material options and a clear, written price.

Call nowFree estimate